Illumina HQ Building 6 - San Diego
PROJECT DETAILS
Having started at 145,000 SF and converting to 298,000 SF just after schematic design’s, this project included a 5-story building with 2-levels of below-grade parking, a high bay warehouse 4-story wing with covered shipping and receiving docks, and a manufacturing and office tower wing. The building shell consists of a linear curtain wall with a combination of punched openings and stone to contextually match the other campus buildings. DGA and DPR were the main team on the C&S, while Ewing Cole and BN Builders completed the TI. The TI focused heavily on laboratory, manufacturing, cold storage, and high bay warehousing features.