8800 Technology Forest Campus Redevelopment

PROJECT DETAILS
This dynamic life science development repositions two existing buildings, adds a ground-up lab and office facility, and introduces a state-of-the-art parking garage, along with vibrant amenities like an F&B hub and a fully equipped fitness center. The vision extends outdoors, with site improvements creating inviting spaces for entertainment, collaboration, and recreation, including sports courts.
The project features extensive mechanical upgrades, including a complete refresh of the existing central utility plant (CUP) and the introduction of new electrical services. The interiors are meticulously crafted, encompassing common areas and advanced R&D laboratories, while the exterior benefits from reskinning and gutting to align with modern standards. A seamless blend of ground-up development and tenant improvements, this multi-story transformation also entails the demolition of existing structures and the installation of critical utilities, requiring precise shutdowns and coordination.
With a focus on sustainability, the project is LEED-certified, integrating spec suites, low-voltage systems, telecommunications, security infrastructure, and essential MEP upgrades. The design also includes thoughtful elements such as art coordination, interior finishing, restaurant amenities, and sleek signage, creating a holistic and forward-thinking environment. This development epitomizes innovation, with multi-project scheduling, core and shell work, landscape design, and careful attention to FF&E and accessories, setting a new standard for life science spaces.
B100
Core & shell total gut and reskin of this 3-story 121,240 SF building included new elevators and stairwells to a full warm shell for medical research. This also included all new HVAC and process utilities. Interior improvements included a COLLAB amenities space with light kitchen, barista station, POS, social area, board room, multi-purpose space, and a fitness center. Added security, IT, and A/V systems, plus the building was 100% backed-up on emergency power.
Parking Garage
This precast concrete structure was designed and built at 4-stories above grade and 1-1/2 below. Containing 498 parking stalls, each level has a curated elevator lobby, heavy security and parking control systems and is screened on the courtyard facade with artistic scrims.
CUP
This 7,000 SF central utility plant was pre-existing but completed gutted and modernized. The build-out included new switchgear, two new water-cooled turbo-core chillers (with room for a third), two new cooling towers, and an emergency generator to back the plant up.
B200
Completed Design Development for this 120,000 SF multi-tenant medical research building.
SITE AMENITIES
Tying the buildings and features of this campus together and drawing energy to the campus were a strong focus. Great attention was given to perimeter landscaping, the internal courtyard, exterior event space, and pickleball courts.